VICTORYSpray Foam
Builders & contractors

For builders and general contractors.

Spray foam scheduled around your build, done to a written spec, with the paperwork you need.

How we fit your schedule.

  • After electrical.Book us once electrical is done.
  • One to two weeks' notice.To get on the schedule.
  • Bids within 24 hours.Send drawings and specs below, or call.
  • Our lifts and scaffolding.The site needs driveway access for a 10-foot trailer.

Our spec.

FoamWhere it goesTypical thicknessR-value per inch
Open cellAttic6 in +R-3.8 to 4.2
Closed cellAttic3 in +R-7.6 to 8.1
Open cellWalls3.5 in +R-3.8 to 4.2
Closed cellWalls2 in +R-7.6 to 8.1
Closed cellCrawlspace2 in +R-7.6 to 8.1
Closed cellRim joists2 in +R-7.6 to 8.1
Open cellPole barn, on OSB or liner4 in +R-3.8 to 4.2
Closed cellPole barn, on metal2 in +R-7.6 to 8.1

R-value measures how well insulation holds back heat. Higher is better. Closed cell is rigid and also blocks moisture; open cell is softer and dampens sound. Ranges are from Universal Polymers (UPC) data sheets, tested at 1 inch. We choose the foam for each job. See the data sheets

Paperwork and terms.

  • Insured: $1M / $2M.General liability, $1M per occurrence and $2M aggregate. We'll send a certificate made out to your company.
  • W-9 on request.Ask for it with your bid request.
  • UPC Master Applicator.Manufacturer-trained on the foam we spray.
  • Commercial terms.Deposit and payment timeline agreed before work starts.
  • Veteran-owned.Based in Anderson, Indiana.

Where we work.

Central Indiana, up to three hours out for larger projects, and into Michigan for the biggest commercial and farm jobs.

Full service area

Bid request

Send the project.

Attach drawings and specs, and we'll get a bid back to you within 24 hours. Need paperwork? Tick it below.

  • Bids within 24 hours
  • Certificate of insurance made out to you
  • W-9 on request
Drawings and specs
Paperwork you need